Two 2 million litre potable water storage tanks were installed to provide backup and resilience to the Wairarapa water supply.
Date: June 2021 to December 2022
Client: Carterton District Council
Project Location: Carterton, Wellington
Services Provided: Project Management
We managed the construction of two 2 million litre potable water storage tanks in Carterton. These tanks were installed to provide backup and resilience to the Wairarapa water supply. This project was considered importance level 3 (IL3).
The foundations were constructed using a post-tensioned concrete slab to minimize the costs and environmental impact of traditional mass concrete foundations.
To mitigate the hazards of working at height, TEAM employed a top-down construction methodology using hydraulic jack lifting. This approach also eliminates the need for large cranes, reducing the associated hazards and environmental impact of operating heavy machinery on site.